Skip to content
Empty, clean office at the end of building work
Commercial and industrial cleaning, and pest control

Post-construction and one-off cleaning

We prepare spaces for handover after building or renovation work, with a dedicated sequence for fine dust, residues and surfaces.

In short

Clean-up after building work: fine dust, residues, deep washing and handover of the spaces.

Our approach

Frequencies and hours built on how the spaces are really used.

Before the specification we look at who uses the premises and when: workstations, toilets, common areas, access and opening hours. Frequencies, products and equipment follow from that, with an area manager who oversees the start and the checks.

Detailed cleaning

Specific products

Work in stages

Ready-to-use handover

Activities

What it can include

The specification is adapted to the needs of the site. The activities listed are the most common tasks that can be included in the work plan.

✓Vacuuming of fine dust
✓Washing of floors and wall coverings
✓Window frames, fixtures and glass
✓Doors, skirting boards and accessible light fittings
✓Sanitary ware and bathrooms
✓Removal of residues compatible with the surfaces
Related services

Where we work in Lombardy and which other services we can follow on the same site.

Direct presence across Lombardy, multi-site projects assessed case by case. Services from the same area go into the same work plan, with one contact.

Frequently asked questions

The questions we are asked most often.

Short answers to help you before the site visit.

When should post-construction cleaning be done?+

Ideally after dusty work is finished and before final fitting-out or handover, so that every surface can be cleaned more effectively.

Do you also remove paint or building residues?+

We assess the type of residue and the material underneath, then use compatible products and methods, with preliminary tests when needed.

How quickly can you intervene?+

It depends on the area and the state of the site: after the visit we indicate the days and team needed, coordinating with the works manager for handover.

Do you dispose of the leftover materials?+

We remove light building residues and dispose of them according to the rules; for large quantities or special materials we coordinate with the contractor and authorised operators.

Let's talk about your site

A precise proposal starts with a good site visit.

Tell us the location, type of premises, approximate area and frequency you need. We will contact you to agree the next steps.

Request a quote